Complete refurbishment of specific areas of the rig within a 39 day period inside Portland Harbour, Victoria.
A total refit of "Arahura" public and crew spaces, and train and vehicle deck.
Spirit of Tasmania III - Addition of Deck 10 Superstructure & Fit Out of 32 Crew Cabins
The project involved the prefabrication of four deck sections some 14 metres long and 8 metres wide.  Each deck included hydraulic lifting and locking cylinders, sheaves, folding handrails, modific
Harvest Barge - 2015
The Stena Clyde arrived into Darwin between drilling campaigns in July 2013 and Taylor Bros managed the change out of the old and new BOP Stacks.
This project involves structural modification of 35 x 40’ shipping containers and then fit out using marine panelling system for use at Casey base Antarctica.
Taylor Bros fabricates H850 and H580 Quick Release Hawser Hooks for Trelleborg Marine Systems. These hook frames are built to DNV, Lloyds, ABS and AWS standards.
CSIRO contracted Taylor Bros to supply a Clean Laboratory Container, Radiation Laboratory Container, Sample Storage Container, HAZMAT and Clean CTD Storage Container.
Taylor Bros has designed a laundry container to be fitted to the Stena Clyde Rig.