Stena Drilling – “Stena Clyde” Laundry Container Prefabrication and Installation – 2013

Taylor Bros has designed a laundry container to be fitted to the Stena Clyde Rig. This container will be built to class rules (DNV), prefabricated at the Taylor Bros workshop in Hobart and transported to Darwin for installation onto the rig by Taylor Bros personnel.